Senior Design

Document Library

Senior Design documents are posted here when the design team makes them available for review.  Documents should be available here no later than 24 hours before the scheduled review time.   MS Project files are saved in their native format (.mpp).  Other documents logged prior to Spring 2012 are in either MS Word or pdf format.  Other documents logged in Spring 2012 and later are in pdf format.  Peer reviewers should provide feedback and comments on the document to the team under review.  The objective is to help the team pass the review on the first attempt. 

Documents are presented below in chronological order of submission date (newest at top of list -  superseded versions grayed out).  As a section completes CSE 4317, any superseded versions of the documents will be deleted with only the final versions retained here.  Documents will be retained in this library for three years.

Document Title

Author

(Team Name)

Version #

Date of Document Date of Review or Doc. Status
System Test Plan (OSS: Outreach Storage System) Aegle 1.0 April 9, 2015 Baseline
System Test Plan (HICS: Home Irrigation Control System) SmartGrass 1.0 April 9, 2015 Baseline
System Test Plan (CSAT: Consultant Staffing Analysis Tool) Real 2.0 April 9, 2015 Baseline
System Test Plan (Neighborhood Patrol Drone) Patrol Crusaders 2.0 April 9, 2015 Baseline
System Test Plan (Maverick Volunteer Tracking System) Time Keepers 2.0 April 9, 2015 Baseline
System Test Plan (Sherpa Drone: Autonomous Guidance System for Stores) Ground Control 2.0 April 8, 2015 Baseline
Detailed Design Specification (OSS: Outreach Storage System) Aegle 2.0 March 6, 2015 Baseline
Detailed Design Specification (HICS: Home Irrigation Control System) SmartGrass 2.0 March 6, 2015 Baseline
Detailed Design Specification (Sherpa Drone: Autonomous Guidance System for Stores) Ground Control 2.0 March 6, 2015 Baseline
Detailed Design Specification (CSAT: Consultant Staffing Analysis Tool) Real 2.0 March 6, 2015 Baseline
Detailed Design Specification (Neighborhood Patrol Drone) Patrol Crusaders 2.0 March 6, 2015 Baseline
Detailed Design Specification (Maverick Volunteer Tracking System) Time Keepers 2.0 March 6, 2015 Baseline
Architecture Design Specification (OSS: Outreach Storage System) Aegle 2.0 January 29, 2015 Baseline
Architecture Design Specification (HICS: Home Irrigation Control System) SmartGrass 2.0 January 28, 2015 Baseline
Architecture Design Specification (Sherpa Drone: Autonomous Guidance System for Stores) Ground Control 2.1 March 6, 2015 Baseline Update
Architecture Design Specification (CSAT: Consultant Staffing Analysis Tool) Real 2.0 January 28, 2015 Baseline
Architecture Design Specification (Neighborhood Patrol Drone) Patrol Crusaders 2.0 January 29, 2015 Baseline
Architecture Design Specification (Maverick Volunteer Tracking System) Time Keepers 2.0 January 21, 2015 Baseline
Project Charter (OSS: Outreach Storage System) Aegle 1.0 December 3, 2014 Baseline
Project Plan (OSS: Outreach Storage System) Aegle 1.0 December 3, 2014 Baseline
Project Charter (HICS: Home Irrigation Control System) SmartGrass 1.2 December 3, 2014 Baseline
Project Plan (HICS: Home Irrigation Control System) SmartGrass 1.0 December 3, 2014 Baseline
Project Charter (Sherpa Drone: Autonomous Guidance System for Stores) Ground Control 1.0 December 3, 2014 Baseline
Project Plan (Sherpa Drone: Autonomous Guidance System for Stores) Ground Control 1.0 December 3, 2014 Baseline
Project Charter (CSAT: Consultant Staffing Analysis Tool) Real 1.0 December 3, 2014 Baseline
Project Plan (CSAT: Consultant Staffing Analysis Tool) Real 1.0 December 3, 2014 Baseline
Project Charter (Neighborhood Patrol Drone) Patrol Crusaders 1.0 December 3, 2014 Baseline
Project Plan (Neighborhood Patrol Drone) Patrol Crusaders 1.0 December 3, 2014 Baseline
Project Charter (Maverick Volunteer Tracking System) Time Keepers 1.0 December 3, 2014 Baseline
Project Plan (Maverick Volunteer Tracking System) Time Keepers 1.0 December 3, 2014 Baseline
System Requirements Specification (OSS: Outreach Storage System) Aegle 2.0 November 16, 2014 Baseline
System Requirements Specification (HICS: Home Irrigation Control System) SmartGrass 2.0 November 11, 2014 Baseline
System Requirements Specification (Sherpa Drone: Autonomous Guidance System for Stores) Ground Control 2.0 November 11, 2014 Baseline
System Requirements Specification (CSAT: Consultant Staffing Analysis Tool) Real 2.0 November 6, 2014 Baseline
System Requirements Specification (Neighborhood Patrol Drone) Patrol Crusaders 2.1 November 14, 2014 Baseline Update
System Requirements Specification (Maverick Volunteer Tracking System) Time Keepers 2.0 November 7, 2014 Baseline
System Requirements Specification (OSS: Outreach Storage System) Aegle 1.0 November 6, 2014 November 7, 2014
System Requirements Specification (HICS: Home Irrigation Control System) SmartGrass 1.0 Novenmerb 4, 2014 November 5, 2014
System Requirements Specification (Sherpa Drone: Autonomous Guidance System for Stores) Ground Control 1.0 Novenmerb 2, 2014 November 3, 2014
System Requirements Specification (CSAT: Consultant Staffing Analysis Tool) Real 1.0 October 29, 2014 October 31, 2014
System Requirements Specification (Neighborhood Patrol Drone) Patrol Crusaders 1.0 October 28, 2014 October 29, 2014
System Requirements Specification (Maverick Volunteer Tracking System) Time Keepers 1.0 October 26, 2014 October 27, 2014
System Test Plan (Echo: Smartphone-Controlled, Interactive Mirror) Reflection 1.0 October 16, 2014 Baseline
System Test Plan (SmartPark: Parking Space Locater System) Sense 1.0 October 15, 2014 Baseline
System Test Plan (Presence: Sensor-Based Home Management System) GLaDOS 2.0 October 15, 2014 Baseline
System Test Plan (Virtual Slugger: VR Batting Simulator) Breaking Bat 1.0 October 10, 2014 Baseline
Detailed Design Specification (Echo: Smartphone-Controlled, Interactive Mirror) Reflection 2.0 October 8, 2014 Baseline
Detailed Design Specification (Presence: Sensor-Based Home Management System) GLaDOS 2.0 October 7, 2014 Baseline
Architecture Design Specification (Presence: Sensor-Based Home Management System) GLaDOS 2.1 October 7, 2014 Baseline Update
Detailed Design Specification (Virtual Slugger: VR Batting Simulator) Breaking Bat 2.0 October 7, 2014 Baseline
Detailed Design Specification (SmartPark: Parking Space Locater System) Sense 2.0 October 6, 2014 Baseline
Detailed Design Specification (Presence: Sensor-Based Home Management System) GLaDOS 1.0 September 26, 2014 September 26, 2014
Detailed Design Specification (Virtual Slugger: VR Batting Simulator) Breaking Bat 1.0 September 24, 2014 September 26, 2014
Detailed Design Specification (SmartPark: Parking Space Locater System) Sense 1.0 September 23, 2014 September 24, 2014
Detailed Design Specification (Echo: Smartphone-Controlled, Interactive Mirror) Reflection 1.0 September 21, 2014 September 22, 2014
Architecture Design Specification (Presence: Sensor-Based Home Management System) GLaDOS 2.0 September 5, 2014 Baseline
Architecture Design Specification (Echo: Smartphone-Controlled, Interactive Mirror) Reflection 2.0 September 4, 2014 Baseline
Architecture Design Specification (SmartPark: Parking Space Locater System) Sense 2.0 August 29, 2014 Baseline
Architecture Design Specification (Virtual Slugger: VR Batting Simulator) Breaking Bat 2.0 August 25, 2014 Baseline
Architecture Design Specification (Presence: Sensor-Based Home Management System) GLaDOS 1.0 August 12, 2014 August 12, 2014
Architecture Design Specification (Virtual Slugger: VR Batting Simulator) Breaking Bat 1.0 August 12, 2014 August 12, 2014
Architecture Design Specification (Echo: Smartphone-Controlled, Interactive Mirror) Reflection 1.0 August 12, 2014 August 12, 2014
Architecture Design Specification (SmartPark: Parking Space Locater System) Sense 1.0 August 12, 2014 August 12, 2014
Architecture Design Specification (Environmentally Responsive Smart Clock) Chronos 2.1 August 12, 2014 Baseline Update
System Test Plan (Environmentally Responsive Smart Clock) Chronos 2.1 August 12, 2014 Baseline Update
Project Charter (Environmentally Responsive Smart Clock) Chronos 2.1 August 12, 2014 Baseline Update
Project Charter (Presence: Sensor-Based Home Management System) GLaDOS 2.0 August 8, 2014 Baseline
Project Plan (Presence: Sensor-Based Home Management System) GLaDOS 2.0 August 8, 2014 Baseline
Project Charter (Virtual Slugger: VR Batting Simulator) Breaking Bat 2.0 August 8, 2014 Baseline
Project Plan (Virtual Slugger: VR Batting Simulator) Breaking Bat 2.0 August 8, 2014 Baseline
Project Charter (Echo: Smartphone-Controlled, Interactive Mirror) Reflection 2.0 August 8, 2014 Baseline
Project Plan (Echo: Smartphone-Controlled, Interactive Mirror) Reflection 2.0 August 8, 2014 Baseline
Project Charter (SmartPark: Parking Space Locater System) Sense 2.0 August 8, 2014 Baseline
Project Plan (SmartPark: Parking Space Locater System) Sense 2.0 August 8, 2014 Baseline
System Test Plan (Smart Garage: Remote Garage Door Controller) Door Keepers 2.1 August 7, 2014 Baseline Update
System Requirements Specification (Smart Garage: Remote Garage Door Controller) Door Keepers 2.1 August 7, 2014 Baseline Update
Architecture Design Specification (Smart Garage: Remote Garage Door Controller) Door Keepers 2.1 August 7, 2014 Baseline Update
Detailed Design Specification (Smart Garage: Remote Garage Door Controller) Door Keepers 2.1 August 7, 2014 Baseline Update
Project Charter (Smart Garage: Remote Garage Door Controller) Door Keepers 2.1 August 7, 2014 Baseline Update
System Test Plan (Mav Tours: Guided UTA Tour Application) UTA2 2.1 August 6, 2014 Baseline Update
System Requirements Specification (Mav Tours: Guided UTA Tour Application) UTA2 2.3 August 6, 2014 Baseline Update
Architecture Design Specification (Mav Tours: Guided UTA Tour Application) UTA2 2.2 August 6, 2014 Baseline Update
Detailed Design Specification (Mav Tours: Guided UTA Tour Application) UTA2 2.1 August 6, 2014 Baseline Update
Project Charter (Mav Tours: Guided UTA Tour Application) UTA2 2.1 August 6, 2014 Baseline Update
Project Plan (Mav Tours: Guided UTA Tour Application) UTA2 2.1 August 6, 2014 Baseline Update
System Requirements Specification (Presence: Sensor-Based Home Management System) GLaDOS 2.0 August 1, 2014 Baseline
System Requirements Specification (Environmentally Responsive Smart Clock) Chronos 2.1 July 30, 2014 Baseline Update
System Requirements Specification (Virtual Slugger: VR Batting Simulator) Breaking Bat 2.0 July 27, 2014 Baseline
System Requirements Specification (Echo: Smartphone-Controlled, Interactive Mirror) Reflection 2.0 July 27, 2014 Baseline
System Requirements Specification (SmartPark: Parking Space Locater System) Sense 2.0 July 24, 2014 Baseline
System Requirements Specification (Presence: Sensor-Based Home Management System) GLaDOS 1.0 July 21, 2014 July 22, 2014
System Requirements Specification (Virtual Slugger: VR Batting Simulator) Breaking Bat 1.0 July 17, 2014 July 18, 2014
System Requirements Specification (Echo: Smartphone-Controlled, Interactive Mirror) Reflection 1.0 July 16, 2014 July 17, 2014
System Requirements Specification (SmartPark: Parking Space Locater System) Sense 1.0 July 14, 2014 July 15, 2014
Detailed Design Specification (Environmentally Responsive Smart Clock) Chronos 2.0 July 2, 2014 Baseline
Project Plan (Environmentally Responsive Smart Clock) Chronos 2.0 May 2, 2014 Baseline
Project Plan (Smart Garage: Remote Garage Door Controller) Door Keepers 1.0 May 2, 2014 Baseline
System Requirements Specification (Environmentally Responsive Smart Clock) Chronos 2.0 April 8, 2014 Baseline
System Test Plan (Virtual Reality Xplorer) VR-X 2.0 April 8, 2014 Baseline Update
System Test Plan (Wireless Blood Pressure Monitoring System) Beta Blockers 2.0 April 1, 2014 Baseline
System Test Plan (Smart Door: Remote Doorbell Response System) Always Home 2.0 April 1, 2014 Baseline
System Test Plan (3D Printer Fabrication System) Ink3D 2.0 April 1, 2014 Baseline
System Test Plan (Sight by Touch System) Survivors 2.0 April 1, 2014 Baseline
System Requirements Specification (Sight by Touch System) Survivors 2.2 April 1, 2014 Baseline update
Architecture Design Specification (Sight by Touch System) Survivors 2.1 March 4, 2014 Baseline update
Detailed Design Specification (Smart Door: Remote Doorbell Response System) Always Home 2.1 March 1, 2014 Baseline update
Detailed Design Specification (Virtual Reality Xplorer) VR-X 2.0 February 28, 2014 Baseline
Detailed Design Specification (Sight by Touch System) Survivors 2.0 February 28, 2014 Baseline
Detailed Design Specification (Wireless Blood Pressure Monitoring System) Beta Blockers 2.0 February 28, 2014 Baseline
Detailed Design Specification (3D Printer Fabrication System) Ink3D 2.0 February 26, 2014 Baseline
Architecture Design Specification (3D Printer Fabrication System) Ink3D 2.1 February 26, 2014 Baseline update
Architecture Design Specification (Smart Door: Remote Doorbell Response System) Always Home 2.0 January 19, 2014 Baseline
System Requirements Specification (Smart Door: Remote Doorbell Response System) Always Home 2.1 January 20, 2014 Baseline Update
Architecture Design Specification (Virtual Reality Xplorer) VR-X 2.0 January 21, 2014 Baseline
Architecture Design Specification (Wireless Blood Pressure Monitoring System) Beta Blockers 2.0 January 21, 2014 Baseline
Project Charter (Sight by Touch System) Survivors 2.0 December 4, 2013 Baseline
Project Plan (Sight by Touch System) Survivors 2.0 December 4, 2013 Baseline
Project Charter (Virtual Reality Xplorer) VR-X 2.0 December 4, 2013 Baseline
Project Plan (Virtual Reality Xplorer) VR-X 2.0 December 4, 2013 Baseline
Project Charter (3D Printer Fabrication System) Ink3D 2.0 December 4, 2013 Baseline
Project Plan (3D Printer Fabrication System) Ink3D 2.0 December 4, 2013 Baseline
Project Charter (Wireless Blood Pressure Monitoring System) Beta Blockers 2.0 December 4, 2013 Baseline
Project Plan (Wireless Blood Pressure Monitoring System) Beta Blockers 2.0 December 4, 2013 Baseline
Project Charter (Smart Door: Remote Doorbell Response System) Always Home 2.0 December 4, 2013 Baseline
Project Plan (Smart Door: Remote Doorbell Response System) Always Home 2.0 December 4, 2013 Baseline
System Requirements Specification (Virtual Reality Xplorer) VR-X 2.0 November 20, 2013 Baseline
System Requirements Specification (3D Printer Fabrication System) Ink3D 2.0 November 18, 2013 Baseline
System Requirements Specification (Wireless Blood Pressure Monitoring System) Beta Blockers 2.0 November 13, 2013 Baseline
System Test Plan (Auto Performance Analyzer) Overdrive 2.1 October 18, 2013 Baseline Update
System Test Plan (Taekwando Match Management System) TKForce 1.0 October 18, 2013 Baseline
System Test Plan (Pin Deck Camera System) Kingpin 1.0 October 17, 2013 Baseline
Detailed Design Specification (Pin Deck Camera System) Kingpin 2.0 October 4, 2013 Baseline
Detailed Design Specification (Taekwando Match Management System) TKForce 2.0 October 4, 2013 Baseline
Detailed Design Specification (Auto Performance Analyzer) Overdrive 2.0 October 4, 2013 Baseline
Architecture Design Specification Specification (Auto Performance Analyzer) Overdrive 2.0 September 6, 2013 Baseline
Architecture Design Specification (Pin Deck Camera System) Kingpin 2.0 September 6, 2013 Baseline
Architecture Design Specification (Taekwando Match Management System) TKForce 2.0 September 6, 2013 Baseline
Project Plan (Auto Performance Analyzer) Overdrive 2.0 August 9, 2013 Baseline
Project Plan (Pin Deck Camera System) Kingpin 2.0 August 9, 2013 Baseline
Project Plan (Taekwando Match Management System) TKForce 2.0 August 9, 2013 Baseline
Project Charter (Auto Performance Analyzer) Overdrive 2.0 August 9, 2013 Baseline
Project Charter (Pin Deck Camera System) Kingpin 2.0 August 9, 2013 Baseline
Project Charter (Taekwando Match Management System) TKForce 2.0 August 9, 2013 Baseline
System Requirements Specification (Taekwando Match Management System) TKForce 2.0 July 28, 2013 Baseline
System Requirements Specification (Pin Deck Camera System) Kingpin 2.0 July 28, 2013 Baseline
System Requirements Specification (Auto Performance Analyzer) Overdrive 2.0 July 25, 2013 Baseline
System Test Plan (BOLTS: Bowling On Lane Tracking System) Galaxy 2.0 July 23, 2013 Baseline
System Test Plan (Smart Fitness Trainer) 4Loop 2.0 July 22, 2013 Baseline
Detailed Design Specification (Smart Fitness Trainer) 4Loop 2.0 July 3, 2013 Baseline
Detailed Design Specification (BOLTS: Bowling On Lane Tracking System) Galaxy 2.0 July 3, 2013 Baseline
Architecture Design Specification (BOLTS: Bowling On Lane Tracking System) Galaxy 2.1 July 3, 2013 Baseline Update
Architecture Design Specification (Smart Fitness Trainer) 4Loop 2.0 June 19, 2013 Baseline
Project Charter (BOLTS: Bowling On Lane Tracking System) Galaxy 1.0 May 3, 2013 Baseline
Project Plan (BOLTS: Bowling On Lane Tracking System) Galaxy 1.0 May 3, 2013 Baseline
Project Charter (Smart Fitness Trainer) 4Loop 1.0 May 2, 2013 Baseline
Project Plan (Smart Fitness Trainer) 4Loop 1.0 May 2, 2013 Baseline
System Requirements Specification (BOLTS: Bowling On Lane Tracking System) Galaxy 2.0 April 12, 2013 Baseline
System Requirements Specification (Smart Fitness Trainer) 4Loop 2.0 April 9, 2013 Baseline
System Test Plan (Child-Parent Pairing System) AVIAR 2.0 April 8, 2013 Baseline
System Test Plan (RRS: Rocket Recovery System) MASS 2.0 April 8, 2013 Baseline
System Test Plan (Avalanche: Digital Racing Gauge) Behind The Curtain 2.0 April 8, 2013 Baseline
System Test Plan (Supply Fetch: Voice-Activated Supply Locater) Easy Office Solutions 2.0 April 7, 2013 Baseline
System Test Plan (Electric Eye: 3D Mapping Robot) Power Vision 2.0 April 5, 2013 Baseline
Detailed Design Specification (RRS: Rocket Recovery System) MASS 2.0 March 8, 2013 Baseline
Detailed Design Specification (Child-Parent Pairing System) AVIAR 2.0 March 8, 2013 Baseline
Detailed Design Specification (Electric Eye: 3D Mapping Robot) Power Vision 2.0 March 7, 2013 Baseline
Detailed Design Specification (Supply Fetch: Voice-Activated Supply Locater) Easy Office Solutions 2.0 March 7, 2013 Baseline
Detailed Design Specification (Avalanche: Digital Racing Gauge) Behind The Curtain 2.0 February 28, 2013 Baseline
Architecture Design Specification (Avalanche: Digital Racing Gauge) Behind The Curtain 2.1 February 26, 2013 Baseline Update
Architecture Design Specification (Child-Parent Pairing System) AVIAR 2.0 February 8, 2013 Baseline
Architecture Design Specification (Supply Fetch: Voice-Activated Supply Locater) Easy Office Solutions 2.0 February 6, 2013 Baseline
Architecture Design Specification (RRS: Rocket Recovery System) MASS 2.0 February 4, 2013 Baseline
Architecture Design Specification (Electric Eye: 3D Mapping Robot) Power Vision 2.0 January 31, 2013 Baseline
Project Charter (Child-Parent Pairing System) AVIAR 1.0 December 4, 2012 Baseline
Project Plan (Child-Parent Pairing System) AVIAR 1.0 December 4, 2012 Baseline
Project Charter (Electric Eye: 3D Mapping Robot) Power Vision 1.0 December 3, 2012 Baseline
Project Plan (Electric Eye: 3D Mapping Robot) Power Vision 1.0 December 3, 2012 Baseline
Project Charter (Avalanche: Digital Racing Gauge) Behind The Curtain 1.1 December 3, 2012 Baseline
Project Plan (Avalanche: Digital Racing Gauge) Behind The Curtain 1.0 December 3, 2012 Baseline
Project Charter (RRS: Rocket Recovery System) MASS 1.0 December 3, 2012 Baseline
Project Plan (RRS: Rocket Recovery System) MASS 1.0 December 3, 2012 Baseline
Project Charter (Supply Fetch: Voice-Activated Supply Locater) Easy Office Solutions 1.0 December 2, 2012 Baseline
Project Plan (Supply Fetch: Voice-Activated Supply Locater) Easy Office Solutions 1.0 December 2, 2012 Baseline
System Requirements Specification (Supply Fetch: Voice-Activated Supply Locater) Easy Office Solutions 2.1 November 19, 2012 Baseline
System Requirements Specification (Child-Parent Pairing System) AVIAR 2.0 November 18, 2012 Baseline
System Requirements Specification (RRS: Rocket Recovery System) MASS 2.0 November 14, 2012 Baseline
System Requirements Specification (Electric Eye: 3D Mapping Robot) Power Vision 2.0 November 12, 2012 Baseline
System Requirements Specification (Avalanche: Digital Racing Gauge) Behind The Curtain 2.0 November 8, 2012 Baseline
System Test Plan (Personal ECG Monitor) eCardiac 1.0 October 30, 2012 Baseline
System Test Plan (NeverBlind: Paintball Friend or Foe Identification System) ITUS 2.0 October 29, 2012 Baseline
System Test Plan (Sliding Profiler: Pavement Bump Detector) The Builders Group Ltd. 1.0 October 25, 2012 Baseline
Detailed Design Specification (Personal ECG Monitor) eCardiac 2.0 October 22, 2012 Baseline
Detailed Design Specification (Sliding Profiler: Pavement Bump Detector) The Builders Group Ltd. 2.0 October 22, 2012 Baseline
Detailed Design Specification (NeverBlind: Paintball Friend or Foe Identification System) ITUS 2.0 October 21, 2012 Baseline
Architecture Design Specification (NeverBlind: Paintball Friend or Foe Identification System) ITUS 2.0 September 24, 2012 Baseline
Architecture Design Specification (Sliding Profiler: Pavement Bump Detector) The Builders Group Ltd. 2.0 September 24, 2012 Baseline
Architecture Design Specification (Personal ECG Monitor) eCardiac 2.0 September 24, 2012 Baseline
System Requirements Specification (Personal ECG Monitor) eCardiac 2.1 September 8, 2012 Baseline Update
Project Charter (Personal ECG Monitor) eCardiac 1.0 August 10, 2012 Baseline
Project Plan (Personal ECG Monitor) eCardiac 1.0 August 10, 2012 Baseline
Project Charter (Sliding Profiler: Pavement Bump Detector) The Builders Group Ltd. 1.0 August 10, 2012 Baseline
Project Plan (Sliding Profiler: Pavement Bump Detector) The Builders Group Ltd. 1.0 August 10, 2012 Baseline
Project Charter (NeverBlind: Paintball Friend or Foe Identification System) ITUS 1.0 August 10, 2012 Baseline
Project Plan (NeverBlind: Paintball Friend or Foe Identification System) ITUS 1.0 August 10, 2012 Baseline
System Requirements Specification (Sliding Profiler: Pavement Bump Detector) The Builders Group Ltd. 2.0 August 6, 2012 Baseline
System Requirements Specification (NeverBlind: Paintball Friend or Foe Identification System) ITUS 2.0 August 2, 2012 Baseline
System Test Plan (Jacobia: Generic Autonomous Control Module) Autono-Mo 1.2 July 27, 2012 Baseline
System Test Plan (Sentinel: Autonomous Paintball Turret) PAINTeK 1.1 July 27, 2012 Baseline
Detailed Design Specification (Z-Wave Smart Home System) BetaHomes 1.0 July 27, 2012 Baseline
Detailed Design Specification (ACC: Automotive Climate Controller) Auto-Climatix 2.0 July 27, 2012 Baseline
Detailed Design Specification (dRadio: Recording Device for Automotive Audio System) AudioTEK 1.1 July 27, 2012 Baseline
Detailed Design Specification (Sentinel: Autonomous Paintball Turret) PAINTeK 2.0 July 23, 2012 Baseline
Detailed Design Specification (Jacobia: Generic Autonomous Control Module) Autono-Mo 2.0 July 22, 2012 Baseline
System Test Plan (Z-Wave Smart Home System) BetaHomes 0.3 July 18, 2012 Baseline
System Test Plan (ACC: Automotive Climate Controller) Auto-Climatix 1.0 July 16, 2012 Baseline
System Test Plan (dRadio: Recording Device for Automotive Audio System) AudioTEK 1.0 July 16, 2012 Baseline
Architecture Design Specification (ACC: Automotive Climate Controller) Auto-Climatix 2.0 June 27, 2012 Baseline
Architecture Design Specification (Sentinel: Autonomous Paintball Turret) PAINTeK 2.0 June 25, 2012 Baseline
Architecture Design Specification (dRadio: Recording Device for Automotive Audio System) AudioTEK 1.1 June 25, 2012 Baseline
Architecture Design Specification (Jacobia: Generic Autonomous Control Module) Autono-Mo 2.0 June 19, 2012 Baseline
Architecture Design Specification (Z-Wave Smart Home System) BetaHomes 2.0 June 19, 2012 Baseline
System Requirements Specification (Sentinel: Autonomous Paintball Turret) PAINTeK 2.1 June 11, 2012 Baseline (Update)
Project Charter (Jacobia: Generic Autonomous Control Module) Autono-Mo 1.0 May 4, 2012 Baseline
Project Plan (Jacobia: Generic Autonomous Control Module) Autono-Mo 1.0 May 4, 2012 Baseline
Project Charter (Z-Wave Smart Home System) BetaHomes 1.0 May 4, 2012 Baseline
Project Plan (Z-Wave Smart Home System) BetaHomes 1.0 May 4, 2012 Baseline
Project Charter (Sentinel: Autonomous Paintball Turret) PAINTeK 1.0 May 4, 2012 Baseline
Project Plan (Sentinel: Autonomous Paintball Turret) PAINTeK 1.0 May 4, 2012 Baseline
Project Charter (ACC: Automotive Climate Controller) Auto-Climatix 1.0 May 4, 2012 Baseline
Project Plan (ACC: Automotive Climate Controller) Auto-Climatix 1.0 May 4, 2012 Baseline
Project Charter (dRadio: Recording Device for Automotive Audio System) AudioTEK 1.0 May 4, 2012 Baseline
Project Plan (dRadio: Recording Device for Automotive Audio System) AudioTEK 1.0 May 4, 2012 Baseline
Project Charter (Maverick Parking System) Parking Shark 2.7 April 27, 2012 Baseline (Update)
System Requirements Specification (Jacobia: Generic Autonomous Control Module) Autono-Mo 2.0 April 22, 2012 Baseline
System Requirements Specification (Z-Wave Smart Home System) BetaHomes 1.0 April 22, 2012 Baseline
System Requirements Specification (ACC: Automotive Climate Controller) Auto-Climatix 2.0 April 12, 2012 Baseline
System Requirements Specification (dRadio: Recording Device for Automotive Audio System) AudioTEK 1.1 April 10, 2012 Baseline