Project Control
Configuration Management
- USES
- The baseline / Iteration scheme
- Well defined procedures, techniques, and responsibilities.
- TO
- Review , Authorize / Reject, and Document all proposed system/project changes.
- FOR MANAGING
- Project definition (project plan)
- System requirements (system requirement specs)
- Design strategy
- H/W and S/W design (detailed design specs)
- Qualification and Verification tests (test plans)
- Documentation.